|
|
NIBS’ new CEO to steer future of U.S. built environment |
Recently appointed new president and CEO AC Powell, JD, CPS, will guide the National Institute of Building Sciences (NIBS) by creating building industry, and public and private sector connections to lead the nation’s built environment future.
|
|
|
|
|
|
|
|
Alibaba HQ design acknowledges ‘the only constant is change’ |
The design for Alibaba’s Shanghai headquarters by the U.S. firm Skidmore, Owings & Merrill (SOM) reveals a distinctive, modular layout reliant on expansive column-free, long-span spaces and a variety of enclosed areas to accommodate a diversity of workstation layouts to suit expanding, contracting and overlapping teams.
|
|
|
|
|
|
Calculating and templating a masonry opening |
At some point, masonry contractors may need to incorporate a jack arch into their work. To calculate the cuts for a custom jack arch, a mason will need to create a cutting template. Three integral pieces of information are necessary to begin the process. First, one must know the width of the rough opening. Second, one must know how many courses vertically the arch will extend, and hence, the width of the jack arch at the extrados (top of the arch) as per the skewback. The jack arch will have full-width units at the extrados and a mason will cut these to a thinner width at the intrados (bottom of the arch or lintel location).
|
|
|
|
Construction-related failures in plumbing pipe |
Metal corrosion is an ever-present problem in the plumbing industry. Common piping materials such as copper, steel, and cast-iron are readily oxidized and thus undergo aqueous corrosion at a rate dependent on the corrosivity of the service environment.
|
|
|
|
 |
DISCUSSIONS OF THE WEEK |
|
SPEC WRITING SOFTWARE |
We are looking in to getting spec writing software and was wondering what is being used. Washington State Parks are very much like small cities with the same types of projects. They tend to be small to medium, utilities, and many historic structures. Any suggestions?
|
JOIN THE DISCUSSION! |
|
O/A/CM STRATEGIES FOR MANAGING COST IN CURRENT MARKET CONDITIONS |
Calling all construction managers, architects, and owner reps for discussion: In this market of continually increasing construction prices, what strategies could we use together as a team during the design phase to minimize the impact of rising costs due to inflation? Working with a CM from the project's onset is already an advantage. Seeking design assisting opportunities through the project's development through constructability reviews and assistance with cost determinations is always a huge help. What are some other strategies that have worked for you?
|
JOIN THE DISCUSSION! |
|
MORE FROM THE CONSTRUCTION SPECIFIER |
|
|
|
DEMO-CASTS ON DEMAND |
|
|
Keys to Using Data to Drive Better Designs
|
Deltek |
|
|
|
|
|
Seven air curtains for the main entrance you never knew you needed
|
Berner |
|
|
|
|
|