Figure-4-cladding

This illustration shows that water-resistive barriers (WRBs) for open-joint cladding systems are installed in front of the continuous insulation (ci) and do not replace the primary air barrier/WRB, located in front of the structural sheathing.
This illustration shows that water-resistive barriers (WRBs) for open-joint cladding systems are installed in front of the continuous insulation (ci) and do not replace the primary air barrier/WRB, located in front of the structural sheathing.

Leave a Comment

Leave a comment

Your email address will not be published. Required fields are marked *