
Figure 8: An illustration of a well-designed and properly-constructed low-slope commercial roof with primary and secondary roof drains set between the 2.4-m (8-ft) minimum requirement at the cricket’s highest point. Note the outer perimeter parapet wall on all four sides and the RTUs with drainage crickets to facilitate positive drainage from the high side of each unit.