IMG_4740-crop

Slabs were placed three times a day at World of Concrete 2013, divided into a trio of sections: one finished with added water, one with no troweling aid, and one with a colloidal silica-based finishing aid. They were finished by volunteers (i.e. professional finishers visiting the show). Workability time was measured, and surface compressive strength of the slabs was subsequently tested.

Leave a Comment

Comments

Your email address will not be published. Required fields are marked *