
Engineers design the floor knowing flatness will change with time, but also specify grinding and patching to bring the floor flatness back to the desired level. To obtain competitive and comparable bids, they include an allowance in the contract for the cost of grinding and patching. The owner controls the allowance and thus benefits when little or no grinding or patching is required.