
Measured workability times of test slabs poured at World of Concrete 2013 in Las Vegas. Each pour consisted of three slabs: one finished with added water, one finished with the colloidal silica finishing aid, and one finished without any finishing aid (i.e. ‘dry’). Workability was determined by volunteer professional finishers working the slabs.