OPT1_COMPOSITE_EDIT

A representation of a 12-story ‘Finding the Forest Through the Trees’ (FFTT) building utilizing wood core walls and glued-laminated timber (glulam) perimeter columns for supporting the structure.

Leave a Comment

Leave a comment

Your email address will not be published. Required fields are marked *