Located in the Los Angeles community of Playa Vista, the Brickyard Campus comprises two, five-story buildings of 27,870 m2 (300,000 sf) and 9290 m2 (100,000 sf) each. Completed in 2017, the two structures are clad with 10,219 m2 (110,000 sf) of thin brick with a white engobe coating.
+ Read More
|
For many years, designers, contractors, and owners have understood the value of a systematic approach to ensure the mechanical and electrical systems in buildings meet the owner’s needs. This approach is known as the commissioning (Cx) process. As a result of implementing the Cx process into the design and construction of buildings, defect claims and litigation related to these commissioned systems are relatively low. The building enclosure (sometimes referred to as the building envelope), however, has often been excluded in the Cx process. Unlike mechanical and electrical systems, poorly performing building enclosures are the most common causes for construction claims and/or construction defect litigation.1
+ Read More
|
You can call it quality assurance (QA), quality control (QC), or quality management—in my view, the process is the same, requiring planning, monitoring, and management.
+ Read More
|
Lippage is the vertical displacement between two adjacent tiles of a ceramic, glass, or stone installation. When excessive, this can lead to numerous problems, ranging from chipped edges to snagged furnishings and appliances to safety hazards.
+ Read More
|
When there is a tile or stone failure, a contributing factor is often the lack of properly installed movement joints. Just like concrete sidewalks and bridges, tile and stone need to have movement joints to control the anticipated movements within a structure.
+ Read More
|
|
|